Move 1b-presort-pipeline design and plan to docs/plans/completed/ with completion summary. Batch classification at 80 prompts/sec shipped. Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com> |
||
|---|---|---|
| .. | ||
| plans | ||
| architecture.md | ||
| development.md | ||
| grammar-table-spec.md | ||
| history.md | ||