Move 1b-presort-pipeline design and plan to docs/plans/completed/ with completion summary. Batch classification at 80 prompts/sec shipped. Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com> |
||
|---|---|---|
| .. | ||
| completed | ||
| 2026-02-16-go-i18n-go-html-design.md | ||
| 2026-02-16-grammar-reversal-engine-design.md | ||
| 2026-02-19-dual-class-disambiguation-design.md | ||
| 2026-02-19-dual-class-disambiguation-plan.md | ||